Home Solutions Special Projects
🛠️ Special Projects

When cargo doesn't fit
the standard mold

Overweight, oversized, temperature-controlled or classified hazardous — our project cargo team plans, permits and executes the shipments general freight can't touch, from road survey to final-mile delivery.

Project Capabilities Project Cargo Team
🛫 AOG — Overweight & AOG air response
🔋 Battery energy storage containers
❄️ Perishable & dangerous goods (DG)
📐 Oversize & overweight equipment
🚢 RoRo & breakbulk vessels

Cargo that doesn't move by the book

A sample of the case work that runs through our special projects desk — permits, terminal coordination and onsite supervision handled in-house, not outsourced.

AOG Case Study
🛫
Case Study — Overweight & AOG Air Export, MIA–SDQ / MIA–HAN
AOG - Aircraft On Ground

Time-critical air shipments that exceed standard weight or urgency thresholds — including aircraft-on-ground engine swaps and overweight air export requiring same-day execution.

Overweight air export coordination across airlines, warehouses, AOA access and trucking vendors
AOG aircraft engine logistics — ramp delivery, air-ride transport, real-time tracking from pickup to arrival
Multi-party coordination across import/export airlines, inbound/outbound warehouses and overseas agents
Battery Storage Case Study
🔋
Case Study — Battery Energy Storage Container Project
Battery Energy Storage Containers

End-to-end project management for oversized, high-weight battery energy storage container shipments — from road survey through final-mile delivery.

RGN overweight permit application and road survey for SOC HC container units
Ocean terminal load in/out handling and outside container yard storage coordination
Onsite loading supervision compliant with UN3536 Class 9 battery safety transportation schemes
Perishable / DG Case Study
❄️
Case Study — Cold-Chain Biotech Program, Nanjing
Perishable & Dangerous Goods (DG)

Temperature-controlled and hazard-classified cargo requiring strict chain-of-custody — from cold-chain biotech shipments to Class 9 dangerous goods.

Reefer truck pickup and frozen storage at both origin and destination airports
Same-day pickup-to-delivery execution to minimize ambient temperature exposure
Full compliance with customer safety transportation schemes for Class 9 hazardous cargo
Oversize Case Study
📐
Case Study — SAV Excavator Project, Savannah → Saint Jose
Oversize & Overweight Equipment

Heavy-lift and out-of-gauge (OOG) equipment moves — from short-notice bulk pickups to specialized container transloading.

High-volume overweight and oversize equipment pickup within short time frames
Transloading from RGN trailers into flat-rack (FR) containers
OOG container ocean terminal handling, survey, and measurement guidance to optimize volume cost

From survey to proof of delivery

The same four-stage process runs behind every project on this page, regardless of mode.

01
Assess & Survey

Road survey, permit applications (RGN, DGR), and safety scheme review before a single unit moves.

02
Coordinate

Airlines, terminals, carriers, agents and customs aligned across every leg through one point of contact.

03
Execute Onsite

Supervised loading, safety compliance checks, and real-time monitoring at origin and destination.

04
Deliver & Track

Final-mile delivery with real-time visibility maintained until proof of delivery is confirmed.

Built for cargo that doesn't fit the rulebook

Project cargo fails when it's handed to a generalist desk. Ours runs on dedicated specialists, in-house compliance, and onsite eyes at every load and discharge.

🛠️
Dedicated project cargo team

Specialists coordinate every project door to door — not handed off to a generalist desk mid-shipment.

📋
Permit & compliance expertise

RGN overweight permits, DGR/UN3536 compliance and OOG survey documentation handled in-house.

🌐
Multi-modal execution

Air, ocean, RoRo and breakbulk options combined on a single project when the cargo demands it.

📡
Real-time multi-party coordination

Airlines, terminals, warehouses, truckers and agents synced through one point of contact, not five.

👷
Onsite load & discharge supervision

Our own staff present at loading and discharge to catch issues before they become delays.

❄️
Proven cold-chain & AOG track record

Zero-mistake cold-chain execution and rapid AOG response for cargo that can't wait.

Have cargo that doesn't fit the standard mold?

Tell us the weight, dimensions and timeline — our project cargo team responds within 2 hours.